- April 8th, 2017, 9:00 pm
#226
How do you add inhibitor into a sealed system like a combi boiler?
using a funnel or through the filling loop?
using a funnel or through the filling loop?
A place of resource for Plumbers and Gas Engineers in the UK.
Dump the pressure BEFORE you put the inhibitor in.
that's what I've got. adapted it with a 1/2" male iron to 15mm comp going onto a bit of 15mm going into a pushfit straight so it can be turned in to the rad tapping.ShaunCorbs wrote: ↑April 8th, 2017, 10:39 pmmade something with something like this
http://www.screwfix.com/p/green-pressur ... lsrc=aw.ds
and a 1/2 male iron
1L of water and inh in there
just need to drain pressure off and pump bottle up
Its a little block in a campsite, so sometimes all[…]
We live in a listed building and our listed buildi[…]
they always do this this happened with my washing […]